Fascia panel pin connection allows for vertical movement of fascia panels.
Use of a shear key prevents lateral movement between layers of EPS Geofoam.
A total of 1,890,000 cubic feet or 597 truck loads of ACH Foam Technologies' EPS Geofoam was used in the completion of the project.
Rapid bridge replacement technology kept traffic flowing during a structural repair of Salt Lake City's I-215 bridge at 3300 South.
The use of Geofoam, in addition to rapid bridge replacement technology sped the completion of the project.
Engineers used Geofoam to reduce settlement of 20 feet of compressible clay in the soil beneath the bridge support system.
24,200 cubic feet of ACH Foam's EPS 22 Geofoam was used to reduce settlement on underlying soils and lateral pressure on the structural wall supporting the bridge.
The pre-fabricated bridge span was constructed nearby. The bridge was moved into place and installed in only two days!