Share PagePrint Page

Geofoam

A light weight fill solution for engineering challenges used in bridge approaches, embankments, green roofs, landscaping and many other innovative applications.

Pages: 1 2 3

  • Kauffman Center for the Performing Arts

    350,000 cubic feet of of EPS 19 Geofoam with PerformGuard termite resistance treatment was installed in thicknesses ranging from 12 inches to 14 feet on the Kauffman Center's parking garage rooftop.

  • Kauffman Center for the Performing Arts

    Geofoam was used to fit the compound sloped concrete roof deck of the parking garage and create a compound sloped top surface for a park. Over the Geofoam, grass, walkways, and trees were installed to create beautiful landscaping.

  • Kauffman Center for the Performaing Arts

    Membrane installation covering the EPS Geofoam. Approximately 118 truckloads of EPS Geofoam was used to complete the nation's second largest green roof geofoam project.

  • Kuaffman Center for the Performing Arts

    Located downtown Kansas City, Missouri in the Crossroads Arts District, the new Kauffman Center for the Performing Arts is the home to three of the region’s leading performing arts organizations: Kansas City Ballet, Kansas City Symphony, and Lyric Opera of Kansas City.

  • the BJC Institute of Health at Washington University School of Medicine in St. Louis

    Five hundred cubic yards of EPS 39 Geofoam were installed in two different walkway areas to limit the total weight placed on the structural roof slab below.

  • Jenks Hign School Math & Science Building

    Finished Planetarium on the rooftop of the 90,000 square foot Jenks High School Math and Science facility.

  • Jenks High School Math & Science Facility

    6 inches of Geofoam void fill was installed beneath the planetarium’s elevated floor slab.

  • West Valley TRAX Light Rail

    West Valley TRAX Light Rail EPS Geofoam project in Salt Lake City Utah. Nation's second Largest EPS Geofoam project since I-15.

  • West Valley TRAX Light Rail

    The first shipments of Geofoam arrived in February 2009. Installation completed around March 2010.