Project: Parleys Canyon Bike Trail
Salt Lake City, Utah
Engineering Firm: EWP Engineering on Salt Lake City
Completed: Fall 1999
Quantity: 150 yd3

Geofoam was used to reduce weight on a water utility and to stablize a slope that had previously failed. This slope had been widened to allow a bike trail to be constructed along the top of the slope. The bike trail runs along the side of I-80.